By Hilary White | Grants Manager
Update from Abderrahim Ouarghidi, HAF's Project and Training Manager:
Digging of the trenches (in which the drip irrigation system will be installed) has just been completed. As explained in an earlier report, this is particularly difficult work in such rocky, steep terrain. Wherever possible, a truck was brought in to dig, but wherever it was too steep to operate the truck, the villagers came out en masse to dig manually.
The painstaking digging has finally been completed, and as of last week, the trenches and 4 irrigation wells had been completely dug, as had the holes, which are now ready to receive the 8,000 transplanted trees after the drip system has been installed.
Once the materials arrive, the drip system will be installed in the trenches, at long last delivering water to the holes. In the meantime, the trees will continue to be cared for in their temporary homes until after the drip irrigation system has been completely installed, at which time they will be transplanted into the newly dug holes (their permanent homes) in the rocky terrain.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser