By BARBARA ASEMPA | PROJECT LEADER
The report covers the period from to13th September, 2022 to 10th January, 2023
Hurray the Nyitawuta Clinic building is completed.
By the Grace of God the clinic building is completed. The water tank mount was completed and a rain harvest system was installed. The tank is currently filled with rain water that was harvested. The bath tub is also completed. The plumber has done the final work to see if water runs through all the taps and that was successful. The painting work is completed both inside and outside. All extra tiling work that was left have been done and the bath tub that was created is also completed.
The total cost of the completed phase 5 was Ghc 30,000 equivalent to $2,727 at an average exchange rate of Ghc11 to 1 USD
We are happy to say that Village Exchange Ghana in collaboration with HOCAP installed a solar system on the roof of the clinic and distributed solar lamps to community members. The community members comes to a section of the clinic facility to pick their charged lamps. We are looking forward for Village Exchage Ghana to extend the solar system to be used at the clinic when operations begins
What we are left with is to fundraise to furnish and equip the clinic after whcih it will be handed over for operations.
May the Almighty God bless all our donors who joined us to make sure this project was a success.
God richly bless you all