By Bibhuti Ranjan Mishra | Project Leader
I am going to submit the 2nd Project report of “Amara Sabai” an organization working in extremely rural area called SUNDARBANS and feel little ashamed because no remarkable improvement is done during this period. However, we are working hard to achieve the target and submit the report for our beloved donors who trust us and donate for a noble cause.
Name of the project: - “Quality education for the kids of disadvantaged group”
Location: - Kailaspur, South 24-Parganas, WB India (Popularly known as Sundarbans)
Project No:- 31758
Brief History: - We are working with education programme since inception of our organization in the year 1970 with early childhood education, Non formal education, Adult education etc. Gradually in changing situation we concentrate to organize formal and quality education for the kids of disadvantaged group and started to create congenial educational environment pulling local resources. But due to paucity of fund we could not achieve the target set up for this purpose. However, in spite of many of the unachieved targets we create lots such as:-
1 Procured Land for running School, Play ground, building, computer lab with sound system and audio visual apparatus, Sports equipments, Children park and so on.
2 Created hygienic toilet and bathroom facilities for the student.
3 Safe Drinking water supply
4 Learning materials.
5 Trained teachers and staff
Our requirement:-
1 Additional building demolishing the old one which is irreparable, to accommodate the students and to create good and educational institution like environment.
2 For physical well being of the students, the children park and play ground needed to be developed.
3 Salary of the teacher and staff may be moderated to be increased.
4 Number of Computer and other equipment needed to be increased.
5 Bench, chair table and office furniture are required to be purchased for the students.
6 Vehicle for transportation etc.
We need estimated 40000 dollar to complete the project work out of which an amount of 5271 dollar has been collected and we received Rs 277828/- in Indian currency till the date. The amount is set aside for the purpose of building construction which is the top most priority along with an amount of Rs 250000/- collected from other sources. Need more amounts to start with and expecting more fund from other sources too. Besides, due to rainy season, road condition is not according to goods carriage and construction work is not possible thus the work cannot be undertaken. Hope during October we can start the construction work and coming report may be reflected with the progress of work.
However the school is running with regular activities and first terminal exam has been completed and second is going to be started from 11th September. Sports programme, celebration of various red letter days, cultural activities etc. have been organized beyond the regular activities.
Our earnest appeal to the donor to stand by us with handful of resources, so that we may fulfill our dream of standing by those blooming flower those who cannot even dream or hope for their good future.
Links:
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser