By Nicolas Delgado | Volunteer
We are happy to share that the construction of the bridge is now 75% complete! A few weeks ago, we were able to restart the work that had been interrupted due to the pandemic and since then, we have:
- laid concrete for the main structure of the bridge, including both the vehicular road and the pedestrian path.
- placed drains on both sides of bridge which have already shown to prevent water buildup.
We’ve made great progress, but we still need your help! To complete the project, we will have to:
-finish the concrete formwork for the ramps connecting the bridge to the existing roadway
-place guardrails for safety
Thank you very much for your generous support. Please considering sharing our project with others!